BIM production help for architecture and project teams worldwideinfo@mjdesigns.in
As-Built Modelling / 11

2D CAD to 3D Revit model conversion

Send us the best available 2D CAD or PDF drawings and supporting information. We can rebuild them as an organised 3D Revit model and record the assumptions your team needs to review.

This helps whenYour project information is in 2D CAD or PDF files and the team needs a usable Revit model before work can continue.

Tell us what you need
Representative Revit model developed from two-dimensional drawing information
Representative technical visual. We define your actual output from the brief and source information.
Where we can help

Here is where we can take work off your team.

Choose only the parts your project needs. The final package depends on the stage, the quality of the source information and what your team needs to do next.

  1. 01We check the point cloud, PDF, drawings, photographs and other survey evidence you supply
  2. 02We review orientation, levels, coverage and which source should take priority
  3. 03We produce the CAD to Revit Conversion output to the visible elements, tolerance and representation rules in your brief
  4. 04We prepare the plans, elevations, sections or model views your team needs next
  5. 05We flag obscured, conflicting, incomplete or unsupported information for review
Specific uses and outputs

What this service can cover.

The exact model content, drawing output and review process are agreed from your source information and intended project use.

2D CAD to 3D Revit model conversion

We audit drawing scale, layers, versions and discrepancies before setting levels, grids, coordinates, families and views in the required Revit environment.

What comes back to you

Files your team can pick up and use.

  • An existing-condition model or CAD file covering the areas named in your brief
  • The requested plans, elevations, sections or model views
  • Coverage, assumption and exception notes
  • A handover record and quality-check summary
Before the first file

Questions worth settling before we start.

01

How are gaps in the source information handled?

Unclear, inaccessible or conflicting areas are queried, qualified or recorded as exceptions. They are not silently modelled as surveyed fact.

02

Is one accuracy level suitable for every project?

No. Suitable tolerance, representation and verification depend on source quality and the model or drawing’s intended use, so these are agreed before production.

Tell us what needs to move forward.

Tell us the delivery date, what information you already have and where the workload is building up. We will tell you what we can take on and what we need from your team.

Tell us about the project